Garmec installs garage decorative epoxy flooring based on your needs:
Quality is our priority
Our coating systems are professionally installed with extreme focus on surface preparation and the utilization of best-in-class quality materials.
Our work process
Our process takes up to 1 or 2 days to install. Your garage will be open to vehicle traffic in
Hours. We recommend our customers that remove every belonging before we arrive.
Floor Surface
Preparation
Floor Surface
Preparation
We use industrial grinder to prep the floor, with industrial vacuum or dust collector (99% efficient).
Primer & Base Coat Application
Primer & Base Coat Application
This process is bounding between the existing floor and the epoxy material.
Flake
Distribution
Flake
Distribution
Manual distribution of flakes or with a blower.
Protective Clear Coat Application
Protective Clear Coat Application
Its call the sealer application, giving the perfect final look and the protection necessary.
Our Finishes
Flakes
Attractive, seamless flooring system consisting of:
100% solids epoxy resin
Colored vinyl flakes installed at 3/32″
Coating sealer on top to increase the resistance and durability of the floor.
Metallic
Attractive, seamless flooring system consisting of:
100% solids epoxy resin
Special effect pigments to create pearlescent, iridescent, and translucent finishes that mimic the natural look for stone and rock formations.
Installed at 1/16″.
+
Completed projects
+
Years of experience
+